DAGDA SEARCH | Back to results | Support

Data Protection Notice Procurement - European Climate, Infrastructure and Environment Executive Agency

Source: https://cinea.ec.europa.eu/about-us/data-protection/data-protection-notice-procurement_en

In accordance with Regulation (EU) 2018/1725 of 23 October 2018 on data protection (hereinafter the Regulation), the European Climate, Infrastructure and Environment Executive Agency (hereafter CINEA) collects your personal data only to the extent necessary to fulfil the precise purpose related to its tasks.

1.  The controller is CINEA:

2.  The purpose of the processing is the evaluation of tenders and the management and administration of contracts between the Agency and the economic operator(s) in the context of its administrative and operational budgets, including related communication.

The data is collected and processed with the purpose:

3.  The data subjects concerned by this notice are the natural persons representing economic operators submitting tenders to or signing contracts with the Agency (authorised/legal representatives and contact persons).

4.  The categories of personal data collected and used for the processing operations are:

For economic operators:

In case personal data have not been obtained from the data subject: evidence that the economic operator is not in a situation of exclusion can be accessed by the Contracting authority on a national database free of charge, in which case the economic operator shall provide the Contracting authority with the internet address of the database and, if needed, the necessary identification data to retrieve the document.

5.  The recipients of the data are:

All recipients are on a "need to know" basis:

In case of audits or proceedings, etc., personal data may be provided to CINEA’s Internal Controller, DPO, Legal Sector, Staff Committee, etc.

6. Data Subjects rights:

You can exercise your rights by sending an email with the requested change(s) to the controller via the functional mailbox indicated here-above in Section 1, by explicitly describing your request. Any correction of your personal data will be taken into consideration from the data protection point of view. Special attention is drawn to the consequences of a request for deletion, as this may lead to an alteration of the terms of the tender and lead to rejection.
In any cases your data will be modified or removed accordingly and as soon as practicable (maximum within 20 working days).

When processing is based on your consent, you have the right to withdraw your consent at any time, without affecting the lawfulness of the processing before such a withdrawal.

However, in line with Article 25 of the Regulation, the data controller may restrict the rights of the data subjects based on the Decision of the Steering Committee (2020) 26 of 14/10/20 (OJEU L 45 on 9.2.2021, p. 80), in case where such restriction constitutes a measure necessary to safeguard the protection of the data subjects or the rights and freedoms of other data subjects, etc.

7.  How does CINEA protect and safeguard your data?

Procurement procedures in place in CINEA ensure that documents submitted in a paper form are only available to the relevant persons and locked at all times when not used during evaluations.
When processed through electronic means, access to data is possible through User-ID and password on a need-to-know basis.
Your data resides on the servers of the European Commission, which abide by strict security measures implemented by DG DIGIT to protect the security and integrity of the relevant electronic assets.

8. The legal basis of the processing are:

9.  The time limits for keeping the data are the following:

In accordance with the 2019 Retention List of the Commission:

After the period mentioned above has elapsed, the files containing personal data may be sampled to be sent to the historical archives of the Agency and/or the European Commission for further conservation in line with the retention policy applied by the Commission . The non-sampled files are destroyed.

10.  Contact information

In case you have any questions about the collection/processing of your personal data, you may contact the data controller who is responsible for this processing activity by using the email address mentioned here above in Section 1.
You may contact at any time the Data Protection Officer of the Agency (CINEA-DPOatec [dot] europa [dot] eu). You have the right to have recourse at any time to the European Data Protection Supervisor (edpsatedps [dot] europa [dot] eu).

 

___________________________________________________

(1Regulation (EU, Euratom) 2018/1046 on the financial rules applicable to the general budget of the Union, repealing Regulation (EU, Euratom) No 966/2012)
(2with a view to the performance of tasks linked to the implementation of Union programmes in the field of transport and energy infrastructure; climate, energy and mobility research and innovation; environment, nature and biodiversity; transition to low-carbon technologies; and maritime and fisheries; comprising, in particular, implementation of appropriations entered in the general budget of the Union and those stemming from external assigned revenue)